Method / resourcemodel-written summary

The planter required 7.57 hr/ha versus 11.12 hr/ha manually.

A claim from Performance Evaluation of Manually Operated Single Row Cotton Planter · 2014

Method / resourceobservedoriginal resultpositivemeasured

Claim · model-written summary

The planter required 7.57 hr/ha versus 11.12 hr/ha manually.

Outcome
average time requiremente0
Value
7.57 hr/hae0
Qualifier
11.12 hr/hae0
Comparator
manually sowinge0

Not reportedMaterialGeneCompoundOrgan / stageInteractorInteractor roleSecond interactorSecond interactor roleTreatmentSettingDirection

Organisms pictured · Representative pictures of the matched species, not figures from the paper.

Gossypium hirsutum
Gossypium hirsutum · TaxonChriKo · CC BY-SA 3.0 · Wikimedia Commons ↗

Verbatim

e0

“average time requirement by manually operated cotton planter was 7.57 hr/ha while manually sowing around 11.12 hr/ha”

✓ located verbatim in the source · abstract, characters 785–901
t0

“Cotton”

✓ located verbatim in the source · title, characters 55–61

Title

Performance Evaluation of Manually Operated Single Row Cotton Planter

Rangapara Dineshkumar; Pandya Jaimin; M. Tech http://www.ijesrt.com/issues%20pdf%20file/Archives-2014/September-2014/7.pdf 2014

Other claims from this paper (6)

Record rev-04ba6fbb77e75f614d623c68ed2050f2978072d4958768591cb57de459f5844d · schema claims-v0.9 · position 5 in the model’s answer