Claim · model-written summary
I3 gave maximum grain yield of 41.19 q/ha.
- Taxon
- Wheat
Triticum aestivumt0 - Treatment
- Irrigation stress at booting stagee0
- Outcome
- grain yielde0
- Value
- 41.19 q/hae0
Not reportedMaterialGeneCompoundOrgan / stageInteractorInteractor roleSecond interactorSecond interactor roleComparatorSettingDirectionQualifier
Organisms pictured · Representative pictures of the matched species, not figures from the paper.

Verbatim
e0“grain yield 41.19 q/ha, Straw yield 79.21 q/ha and harvest index 105.63% was shown by I3 (Irrigation stress at booting stage)”
t0“Wheat”
Title
Effect of Irrigation Stress and Nitrogen Levels on Growth, Yield and Economics of Wheat
Lovepreet Singh Sran; Baljinder Singh; Ramandeep Kaur Ecology Environment and Conservation 2025. doi:10.53550/eec.2025.v31i01s.044
Other claims from this paper (17)
- Intervention effect At 140 kg/ha nitrogen, wheat height was 13.41 cm at 20 DAS.
- Intervention effect At 140 kg/ha nitrogen, wheat height was 29.85cm at 40 DAS.
- Intervention effect At 140 kg/ha nitrogen, wheat height was 63.32cm at 70 DAS.
- Intervention effect At 140 kg/ha nitrogen, wheat height was 96.63cm at harvest.
- Intervention effect At 140 kg/ha nitrogen, test weight was 41.76 gm.
- Intervention effect At N3, spike length reached a significant maximum of 11.67cm.
- Intervention effect At N3, grain yield reached 36.45 q/ha.
- Intervention effect At N3, straw yield reached 69.89 q/ha.
- Intervention effect At N3, harvest index reached 105.13%.
- Intervention effect I3 gave straw yield of 79.21 q/ha.
- Intervention effect I3 gave harvest index of 105.63%.
- Intervention effect N3 with I3 produced grain yield of 46.12q/ha, above other treatments.
- Intervention effect N3 with I3 produced straw yield of 85.27 q/ha.
- Intervention effect N3 with I3 produced harvest index of 110.61%.
- Intervention effect N3 with I3 produced gross return of Rs. 97483.66/ ha.
- Intervention effect N3 with I3 produced net return of Rs.70235/ha.
- Intervention effect N3 with I3 produced benefit cost ratio of 3.55.